Civil, Marine & Three WatersLyttelton
Lyttelton Port of Christchurch
Programme Assurance
Impartial programme assurance for the Lyttelton Port works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
104 representative engagements, in 68 centres across New Zealand and the Pacific. Each one shows the sector, the service and where the matter arose.
Our work is national, with engagements across the Pacific. Select a country, a sector or a marker to filter the engagements below.
Project locations
Australia · Pacific
Select a marker to filter to that engagement · drag to pan, or zoom in
Filter by country
Sectors we work across
12 sectors
Representative matters across our service lines, each supported by programme, record and evidence analysis.
Drag a card to rearrange the order
Civil, Marine & Three WatersLyttelton
Programme Assurance
Impartial programme assurance for the Lyttelton Port works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
Civil, Marine & Three WatersHerne Bay, Auckland
Risk Analysis and Forensic Delay Analysis
Programme-linked risk analysis and forensic delay analysis of the Central Interceptor works, quantifying time exposure and tying delaying events to the critical path.
Clevedon, Auckland
Forensic Delay Analysis
Forensic delay analysis of the Clevedon water and wastewater works, establishing causation and the effect of delaying events on the critical path from the programme and contemporaneous record.
Civil, Marine & Three WatersOrewa Beach, Auckland
Contracts Management
Contracts management for the Orewa seawall works, administering the contract, progress and change records through delivery.
Waikeria, Waikato
Programme Assurance
Impartial programme assurance of the wastewater upgrade works, testing programme logic, progress and delivery forecasts as the works proceeded.
Selwyn District, Canterbury
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Central Plains Water scheme, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Civil, Marine & Three WatersSunny Heights, Orewa, Auckland
Expert Evidence
Impartial expert evidence on the Sunny Heights land development, prepared to evidentiary standards on the programming and delay issues in dispute.
Civil, Marine & Three WatersHamilton
Expert Evidence
Impartial expert evidence on the Landsdale subdivision works, setting out the programming and delivery issues in dispute in a form a tribunal can follow and test.
Civil, Marine & Three WatersRangitahi Peninsula
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Rangitahi subdivision works, together with forensic delay analysis tying delaying events to the critical path.
Civil, Marine & Three WatersRotokauri, Hamilton
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Rotokauri subdivision works, together with forensic delay analysis tying delaying events to the critical path.
Civil, Marine & Three WatersTairua
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Tairua coastal development, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Commercial & Mixed-UseChristchurch
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Awly Building works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Commercial & Mixed-UseNorth Shore, Auckland
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the BMW showroom works, together with forensic delay analysis tying delaying events to the critical path.
Commercial & Mixed-UseAuckland CBD
Full Programme Management for Tier 1 Subcontractor and Forensic Delay Analysis
Full programme management for a tier 1 subcontractor on the Commercial Bay works, together with forensic delay analysis tying delaying events to the critical path.
Commercial & Mixed-UsePenrose, Auckland
Contracts Management
Contracts management for the Hydraulink fitout, administering the contract, progress and change records through delivery.
Commercial & Mixed-UseAuckland
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the IKEA store works, together with forensic delay analysis tying delaying events to the critical path.
Commercial & Mixed-UseAuckland CBD
Contracts Management
Contracts management for the Kordia fitout, administering the contract, progress and change records through delivery.
Commercial & Mixed-UseAuckland CBD
Expert Evidence
Impartial expert evidence on the Les Mills carpark building, prepared to evidentiary standards on the programming and delay issues in dispute.
Commercial & Mixed-UseAuckland CBD
Programme Assurance
Impartial programme assurance for the Project Waka works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
Commercial & Mixed-UseTakapuna, Auckland
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of The Strand fitout, together with forensic delay analysis tying delaying events to the critical path.
Commercial & Mixed-UseHamilton
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Tristram Precinct works, together with forensic delay analysis tying delaying events to the critical path.
Commercial & Mixed-UseWaterfront, Auckland
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Park Hyatt waterfront hotel works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Commercial & Mixed-UseAuckland Airport
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Pullman hotel works, together with forensic delay analysis tying delaying events to the critical path.
Commercial & Mixed-UseAuckland CBD
Programme Assurance
Impartial programme assurance for the Grand Chancelor hotel works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
Commercial & Mixed-UseQuay Street, Auckland CBD
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the M Social hotel works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Commercial & Mixed-UseChristchurch
Programme Assurance
Impartial programme assurance for the Avon River precinct works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
Commercial & Mixed-UseAuckland
Programme Assurance
Impartial programme assurance for the Auckland waterfront works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
Commercial & Mixed-UseTamaki, Auckland
Programme Assurance
Impartial programme assurance for the Tamaki regeneration works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
Apia, Samoa
Programme Assurance
Impartial programme assurance of the Digicel works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
Energy & UtilitiesTuritea
Forensic Delay Analysis and Expert Witness
Forensic delay analysis of the Turitea Wind Farm works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Energy & UtilitiesTauhara, Taupo
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Tauhara geothermal power station works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Energy & UtilitiesTakanini, Auckland
Full on-site Programme Assurance
Full on-site programme assurance for the data centre works, monitoring progress against the critical path and testing delivery forecasts as the works proceeded.
Transport & AviationChristchurch
Impartial Programme Assurance
Impartial assurance of an integrated terminal programme, testing critical path, trade interfaces and forecast credibility ahead of staged handovers.
Transport & AviationAuckland
Full On-site Construction Program Management Services
Full on-site programme management for the check-in hall works: baseline and updated programmes, progress monitoring and recovery planning, sequencing construction around live terminal operations.
Wellington
Master planning
Master planning input for Wellington International Airport, aligning staged development and works sequencing with the delivery programme and operational constraints.
Transport & AviationAuckland
Impartial Programme Assurance
Independent programme assurance for the Eastern Busway, reviewing project programmes and the processes used to prepare, update and record programme information. Our review also examined the team's internal risk-capture processes and approach to risk analysis.
Transport & AviationPapakura
Forensic Delay Analysis and Expert Witness
Programme-linked risk assessment of rail electrification works, quantifying time and cost exposure across possessions and commissioning.
Te Awamutu
Forensic Delay Analysis and Extension of Time Claims
Impartial extension of time assessment of a state highway intersection upgrade, tying weather and consenting events to the critical path.
Hastings
Forensic Delay Analysis and Extension of Time Claims
Impartial forensic delay analysis and extension of time assessment of the Warwick Road reconstruction works, tying weather and consenting events to the critical path.
Auckland
Forensic Delay Analysis
Forensic delay analysis of the AMETI works, establishing causation and the effect of delaying events on the critical path from the programme and contemporaneous record.
Auckland
Full on-site (8 months) Programme Assurance
Full on-site programme assurance over an eight-month period for the City Rail Link works, monitoring progress against the critical path and testing delivery forecasts as the works proceeded.
Hospitals, Healthcare & RetirementPoint Chevalier, Auckland
Full on-site Programme Assurance
Full on-site programme assurance for the Mason Clinic works, monitoring progress against the critical path and testing delivery forecasts as the works proceeded.
Hospitals, Healthcare & RetirementDunedin
Impartial Programme Assurance
Impartial assurance of the outpatient hospital programme, testing programme logic, key interfaces and forecast credibility for the commissioning party.
Hospitals, Healthcare & RetirementNewtown, Wellington
Forensic Delay Analysis
Forensic delay analysis of the Wakefield Hospital works, establishing causation and the effect of delaying events on the critical path.
Hospitals, Healthcare & RetirementMiddlemore, Auckland
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Middlemore Hospital works, together with forensic delay analysis tying delaying events to the critical path.
Hospitals, Healthcare & RetirementBrowns Bay, Auckland
Impartial Programme Assurance
Impartial programme assurance for the Aria Bay Retirement Village works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
Hospitals, Healthcare & RetirementArataki, Mount Maunganui
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Somervale Retirement Village works, together with forensic delay analysis tying delaying events to the critical path.
Hospitals, Healthcare & RetirementBurnside, Christchurch
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Russley Retirement Village works, together with forensic delay analysis tying delaying events to the critical path.
Port Moresby, Papua New Guinea
Full Programme Management
Full programme management for the Port Moresby General Hospital works, covering programme development, progress monitoring, forecasting and recovery planning.
Justice & GovernmentMt Eden
Full on-site Programme Assurance
Full on-site programme assurance for the prison works, monitoring progress against the critical path and testing delivery forecasts as the works proceeded.
Justice & GovernmentTempleton
Impartial Programme Assurance and EOT Claims
Impartial programme assurance of the modular build, with extension of time assessment tying delaying events to the programme and critical path.
Justice & GovernmentWaikeria
Programme Assurance at Design Stage
Programme assurance during the design stage, testing programme logic, key milestones and delivery assumptions before construction commenced.
Justice & GovernmentPapakura
Full Programme and Project Management Services
Full programme and project management services for the centre's delivery, from baseline programming and progress monitoring through to completion.
Justice & GovernmentOtara
Full Programme and Project Management Services
Full programme and project management services for the centre's delivery, including programme development, progress monitoring and forecasting.
Justice & GovernmentHamilton
Full Programme and Project Management Services
Full programme and project management services for the regional office fit-out and delivery, covering programming, monitoring and completion.
Justice & GovernmentTakapuna
Impartial Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the station works, testing programme logic, progress and forecasts, with forensic delay analysis tying delaying events to the critical path.
Justice & GovernmentTe Atatu
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the station works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Justice & GovernmentMt Albert
Engagement on the research centre's delivery programme, testing programme logic, key milestones and delivery assumptions against the project record.
Justice & GovernmentMt Albert
Programme Assurance
Programme assurance of the laboratory's delivery programme, testing programme logic, key milestones and delivery assumptions against the project record.
Honiara, Solomon Islands
Impartial Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the water reservoir storage works, together with forensic delay analysis tying delaying events to the critical path.
Honiara, Solomon Islands
Impartial Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the trunk main water supply works, together with forensic delay analysis tying delaying events to the critical path.
Honiara, Solomon Islands
Impartial Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the wastewater works, together with forensic delay analysis tying delaying events to the critical path.
Chuuk
Impartial Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Chuuk water supply works, together with forensic delay analysis tying delaying events to the critical path.
ResidentialGlenorchy
Programme Assurance
Impartial programme assurance for the Manukard residence, testing programme logic, key milestones and delivery forecasts for the owner.
Auckland
Negotiation and Mediation
Impartial negotiation and mediation support on the La Casa residence, working from the programme and contemporaneous record to resolve the matters in dispute without recourse to a hearing.
Ellerslie, Auckland
Contract Review
Contract review for the Ellers residence, testing the contract documents, programme obligations and notice provisions before the parties committed to the works.
Taupo
Programme Assurance
Impartial programme assurance for the 2 Tree Lodge works, testing programme logic, key interfaces and delivery forecasts for the owner.
Waitoki, Auckland
Mediation and Negotiation
Impartial mediation and negotiation support on the Residence on Bodhisattva, setting out the programming and delivery issues from the record to help the parties reach agreement.
ResidentialAuckland CBD
4D Planning and Programme Assurance
4D planning and impartial programme assurance for the Park Residences works, linking the construction sequence to the programme and testing delivery forecasts for the commissioning party.
ResidentialTakapuna, Auckland
Full Programme and Project Management
Full programme and project management for the Lake Rd Lofts works, covering programme development, progress monitoring, forecasting and delivery through to completion.
ResidentialAuckland CBD
Forensic Delay Analysis
Forensic delay analysis of the CAB Apartments works, establishing causation and the effect of delaying events on the critical path from the programme and contemporaneous record.
ResidentialTupu Arangi, Christchurch
Programme Assurance
Impartial programme assurance for the student accommodation works at the University of Canterbury, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
ResidentialPakuranga, Auckland
Programme Assurance
Impartial programme assurance for the Fortune Apartments works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
ResidentialKingsland, Auckland
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the NXN Apartments works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
ResidentialNorthcote, Auckland
Programme Assurance
Impartial programme assurance for the Kainga Ora Apartments works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
ResidentialPapamoa
Negotiation
Impartial negotiation support on the Kohu Quarter works, setting out the programming and delivery issues from the record to help the parties reach agreement.
ResidentialPonsonby, Auckland
Full Project Management
Full project management for the Nexus Apartments works, covering programme development, progress monitoring, forecasting and delivery through to completion.
EducationMassey, Auckland
Impartial Programme Assurance
Impartial programme assurance for the Innovation Complex works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
EducationDunedin
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the University of Otago works, together with forensic delay analysis tying delaying events to the critical path.
EducationDunedin
Programme Assurance
Impartial programme assurance for the Otago Polytechnic works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
EducationMount Albert, Auckland
Full Programme Management
Full programme management for the Mount Albert Grammar School works, covering programme development, progress monitoring, forecasting and delivery through to completion.
Ormiston, Auckland
Full Programme Management
Full programme management for the Ormiston College works, covering programme development, progress monitoring, forecasting and delivery through to completion.
Ellerslie, Auckland
Forensic Delay Analysis
Forensic delay analysis of the Adventure Land Early Learning Centre works, establishing causation and the effect of delaying events on the critical path from the programme and contemporaneous record.
Industrial & ManufacturingTe Aroha
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Te Aroha meat processing factory works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Industrial & ManufacturingHamilton
Forensic Delay Analysis
Forensic delay analysis of the Big Chill Distribution works, establishing causation and the effect of delaying events on the critical path from the programme and contemporaneous record.
Otago
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the SPX milk processing factory works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Industrial & ManufacturingGrey Lynn, Auckland
Forensic Delay Analysis
Forensic delay analysis of the Bunnings Warehouse works, establishing causation and the effect of delaying events on the critical path from the programme and contemporaneous record.
Sport & RecreationChristchurch
Forensic Delay Analysis
Forensic delay analysis of the Metro Sports facility works, establishing causation and the effect of delaying events on the critical path from the programme and contemporaneous record.
Sport & RecreationChristchurch
Forensic Delay Analysis
Forensic delay analysis of the Christchurch Convention Centre works, establishing causation and the effect of delaying events on the critical path from the programme and contemporaneous record.
Sport & RecreationChristchurch
Programme Assurance
Impartial programme assurance for the Te Kaha stadium works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
Sport & RecreationRotorua
Programme Assurance
Impartial programme assurance for the Rotorua Aquatic Centre works, testing programme logic, key interfaces and delivery forecasts for the commissioning party.
Cambridge
Forensic Delay Analysis
Forensic delay analysis of the Cambridge Pools works, establishing causation and the effect of delaying events on the critical path from the programme and contemporaneous record.
Remediation & Specialist WorksMt Wellington, Auckland
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Mountain Rd Apartments works, together with forensic delay analysis tying delaying events to the critical path.
Remediation & Specialist WorksAuckland CBD
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Chancery works, together with forensic delay analysis tying delaying events to the critical path.
Remediation & Specialist WorksNew Lynn, Auckland
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Crown Lynn Condominiums works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Remediation & Specialist WorksGrafton, Auckland
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Grafton Villas works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Wellington
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Piedmont Apartments works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Remediation & Specialist WorksGrey Lynn, Auckland
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Quattro Apartments works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Remediation & Specialist WorksAuckland CBD
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Quays Apartments works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Remediation & Specialist WorksTakapuna, Auckland
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Spencer on Byron works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Remediation & Specialist WorksGrey Lynn, Auckland
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of The Pulse Apartments works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Remediation & Specialist WorksHenderson, Auckland
Forensic Delay Analysis and Expert Evidence
Forensic delay analysis of the Waidier Apartments works, establishing causation and critical-path effect, with impartial expert evidence prepared to evidentiary standards.
Remediation & Specialist WorksAuckland CBD
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Westmount Apartments works, together with forensic delay analysis tying delaying events to the critical path.
Remediation & Specialist WorksAuckland
Programme Assurance and Forensic Delay Analysis
Impartial programme assurance of the Westwood Park Apartments works, together with forensic delay analysis tying delaying events to the critical path.
If your project is delayed, contested or at risk, the first step is a confidential conversation. We will listen, assess whether we can help, and explain the process — without obligation.